Overall layout plan
Centralized arrangements for organizing ingredients, mixing, and discharging, as well as equipment combinations, maintenance access, and loader feeding space, are included in enquiry. The shipping method is arranged in combination with the splitting, individual size and weight, and the conditions of the destination port of complete plant.
Split Layout Plan
Arrange the aggregate, powder, mixing, and finished product storage units separately according to the site, and confirm the conveying distance, connection interfaces, cables, and foundation positions. Before delivery, check the transport units, installation sequence, and on-site hoisting conditions.