Find Bottlenecks with Data
Record batch cycles, waiting times, and downtime reasons under different formulas and shifts.
EXISTING PLANT EXPANSION
The actual output of an existing station may be affected by order peaks, batching, main mixer, powder supply, unloading, vehicles, or maintenance downtime.

PRODUCT OVERVIEW / KEY DETAILS
The actual output of an existing station may be affected by order peaks, batching, main mixer, powder supply, unloading, vehicles, or maintenance downtime. Easysail can communicate the twin-line plan according to existing equipment data, main mixer replacement or batching, warehousing, conveying, and other single-machine supplements.
01 / BUYING DECISIONS
ready-mix concrete, engineering feeding, prefabrication, and road base production each have corresponding equipment combinations.
Record batch cycles, waiting times, and downtime reasons under different formulas and shifts.
Mechanical dimensions, electrical, control, and maintenance space need to be verified on site.
main mixer, batching, material storage, and whole-line supplements can be compared separately, and the scope of renovation is determined according to actual bottlenecks.
REAL EQUIPMENT / PROJECT PHOTOS
Explore equipment layouts, components and installation details. Request the specifications and supply list for the configuration you need.







02 / FACTORY & REAL EQUIPMENT
On-site photos of the twin-line concrete equipment. The images show the equipment, interfaces, and production status, while product records and order documents continue to specify the exact model, configuration, and supply content.
View Chinese factory production and equipment information ↗03 / FACTORY QUOTATION PROCESS
We review your production requirements, specify the equipment and site connections, then prepare an itemized factory quotation with delivery terms.
Share your production requirements and project conditions with our sales team.
Confirm the model, main components and included equipment.
Check equipment connections, electrical supply and site layout.
Review the equipment list, packing, technical documents and delivery terms in your quotation.
04 / PROJECT INPUTS
Send your preferred model, or share the application, target output, materials, site conditions, electrical supply and destination.
Submit existing site information to assess expansion scope ↗05 / FAQ
Find practical answers about equipment selection, configuration and ordering. Your quotation will confirm the final specification and commercial terms.
Identifying bottlenecks and interfaces with data to determine the scope of renovation will be included in equipment configuration. Record batch cycles, waiting, and downtime reasons under different formulations and shifts.
Mechanical dimensions, electrical, control, and maintenance space need to be checked on-site. Factory quotation will also list the equipment scope, options, packaging, and destination conditions.
You can provide existing equipment: model, year, configuration, and status; production records: batch, shift, formula, and bottlenecks. Undetermined contents can be supplemented in subsequent technical communications.
CHINA FACTORY QUOTATION
Send your model or production requirements, site conditions and destination. Our sales team will prepare the configuration and itemized supply list.